Completed Job Reference List in Last 5 Years

Civil & Structural

No Description Client Value Year Completed
1 Cadangan Pembangunan yang Mengandungi :- a) Satu Blok Kompleks Akademi Latihan 6 Tingkat (b) Satu Blok Bangunan Latihan Taktikal 3 Tingkat (c) Satu Blok Kuarters Kelas F (100 Unit) 14 Tingkat Di Pusat Latihan Polis (PULAPOL) Di atas Sebahagian Lot-Lot PT 30 (HSD 97590), Mukim Bandar Kuala Lumpur dan PT 6668 (HSD 97592), Mukim Setapak, Wilayah Persekutuan Kuala Lumpur untuk Tetuan Pembinaan BLT Sdn Bhd Pembinaan BLT Sdn Bhd MYR 147,000,000.00 2012
2 Cadangan Membina Dan Menyiapkan Projek IBS Bagi Sekolah Kebangsaan Saujana Puchong (1) – Pakej 20 Kementerian Pendidikan Malaysia MYR 23,898,313.30 2013
3 Cadangan Menyiapkan Projek IBS Sekolah Kebangsaan Desa Mahkota (1) yang Mengandungi 36 Bilik Darjah dan Kemudahan Berkaitan di Mukim Segambut, Wilayah Persekutuan Kuala Lumpur – Pakej 20 Kementerian Pendidikan Malaysia MYR 33,388,086.75 2013
4 Pakej B28 – Kerja-Kerja Menaiktaraf Empat (4) Loji Rawatan Kumbahan Sediada Kepada Kategori 1 Di Kawasan Selangor (Reka & Bina). Jabatan Perkhidmatan Pembetungan MYR 22,862,780.00 2015
5 Proposed Development on 448.61 Acres of Land on Lot 18370 (PT 21628), Mukim Semenyih, Daerah Hulu Langat, Selangor Darul Ehsan for Symphony Hills Sdn.Bhd ("Serene Heights") – Package 16(4): Design, Construction, Commissioning, Handing Over and Provision of Engineering Works for TNB Pencawang Utama (PPU-1) Symphony Hills Sdn.Bhd MYR 3,503,380.00 2016
6 Proposed Upgrading of Water Supply System at Nilai Layby (Southbound and Northbound) PLUS MYR 2,475,332.44 2018
7 Proposed New Entry Ramp From Seremban To Kuala Lumpur (Northbound) At The Existing Seremban Interchange PLUS MYR 12,161,000.00 2018
7 Proposed Development on 448.61 Acres of Land on Lot 18370 (PT 21628), Mukim Semenyih, Daerah Hulu Langat, Selangor Darul Ehsan for Symphony Hills Sdn.Bhd ("Serene Heights") - Package 12(2): Construction of Detention Pond No.1 to No.3 and All Associated Works Symphony Hills Sdn.Bhd MYR 3,500,000.00 2018

Electrical

No Description Client Value Year Completed
1 T.6110 – Additional Transformer Capacity (ATC) PPU Beluran – 1 No. of Transformer 5MVA Sabah Electricity Sdn Bhd MYR 2,073,500.00 2012
2 Supply Install And Commissioning of One (1) 240MVA YNa0d1 Auto Transformers as Replacement for PMU Skudai Supergrid Transformer. Tenaga Nasional Berhad MYR 6,888,000.00 2013
3 Kerja – kerja "Relocation of 1x30MVAR Capacitor Bank, 132kV Switchgear and Ancillart Equipment Complete with Associated Civil Work from PMU 132/33/11kV Mergong, Kedah to PMU 132/11kV Bahau, Negeri Sembilan Tenaga Nasional Berhad MYR 1,932,504.00 2013
4 Installation, testing and commissioning of 33kV aluminium XLPE single core underground cables and accessories for route 1: PMU Bukit Minyak to PPU Science Park and route 2: from SSU Ibiden to PPU Science Park for TNB Distribution, Pulau Pinang. Tenaga Nasional Berhad MYR 1,998,967.00 2013
5 Proposed 132kv Double Circuit Underground Cable (100MVA) from PMU 132kV Sg.Siput Switching Station to KTMB Sg. Siput 132kV Feeder Station, Perak. Tenaga Nasional Berhad MYR 2,289,980.00 2015
6 132kV Cable Installation Work for TMP2 Project Chiyoda Keiso AEC Sarawak Sdn Bhd MYR 1,051,710.00 2013
7 132kV Cable Installation Work for TMP2 Project Chiyoda Keiso AEC Sarawak Sdn Bhd MYR 136,380.00 2013
8 Phnom Penh-Kampong Cham Transmission Project Cambodian Transmission Limited USD 40,000,000.00 2014
9 Proposed Upggrading of 132kV Transmission Line Kota Tinggi – Ulu Tiram – Tebrau Tenaga Nasional Berhad MYR 4,650,000.00 2014
10 Supply, Erect and Commissioning of 132kV Equipment for "Replacement & Refurbishment" for PMU 132kV Sungai Semenyih Water Work (SSWW) Tenaga Nasional Berhad MYR 2,590,000.00 2014
11 Construction, Completion and Commissioning of TNB 33kV and 11kV Low Voltage Cable Relocation Works for the Kelana Jaya (KLJ) Line Extension Project Syarikat Prasarana Negara Berhad MYR 15,285,040.00 2014
12 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead A: SSU BIOCON Tenaga Nasional Berhad MYR 140,000.00 2014
13 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead B: SSU CUF Tenaga Nasional Berhad MYR 140,000.00 2014
14 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead C: SSU EVYAP Tenaga Nasional Berhad MYR 140,000.00 2014
15 Construction, Completion and Commissioning of TNB 33kV and 11kV Low Voltage Cable Relocation Works for the Ampang (AMG) Line Extension Project Syarikat Prasarana Negara Berhad MYR 29,050,349.95 2014
16 Installation, testing and commissioning of 33kV aluminium XLPE single core underground cables and accessories for route 1: PMU Shah Alam West to SSU Setia Mall, for TNB Distribution, Selangor Darul Ehsan. Tenaga Nasional Berhad MYR 4,364,322.00 2014
17 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead E: SSU IDP Tenaga Nasional Berhad MYR 140,000.00 2014
18 Installation, Testing and Commissioning of 33kV Aluminium XLPE Single Core Underground Cables and Accessories for TNB Distribution Kuala Lumpur; Route 1: PMU KL East to PPU Selayang Utama, Route 2: PPU Pasar Borong to PPU Hospital Selayang, Route 3: PMU Batu Caves to PPU Pasar Borong, For TNB Distribution, Wilayah Persekutuan Kuala Lumpur. Tenaga Nasional Berhad MYR 4,248,974.00 2014
19 Installation, Testing and Commissioning of 33kV Aluminium XLPE Single Core Underground Cables, Underground Fiber Optic Cables and Accessories from PMU ABBA to SSU Permanis, for TNB Distribution Kuala Lumpur Tenaga Nasional Berhad MYR 7,400,630.00 2014
20 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead A: SSU Ramatex Tenaga Nasional Berhad MYR 140,000.00 2015
21 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead B: SSU Lion Eco Tenaga Nasional Berhad MYR 140,000.00 2015
22 Supply And Install of One (1) Unit 275/132kV 240MVA YNa0d1 Auto Transformer to TNB Asset Maintenance Department for use as Strategic Spare. Tenaga Nasional Berhad MYR 5,589,800.00 2015
23 Installation, Testing And Commissioning Of 33kV Aluminium XLPE Single Core Underground Cables, And Accessories For Route 1: PMU Bukit Beruntung Cut & Joint SSU Perodua / PPU Sg. Buaya; Route 2: PMU Bukit Sentosa To SSU Perodua No.2; Route 3: SSU Perodua To SSU Perodua No.2, For TNB Distribution, Selangor. Tenaga Nasional Berhad MYR 2,684,649.00 2015
24 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead D: SSU Hershey Tenaga Nasional Berhad MYR 140,000.00 2015
25 Installation & Commissioning of 33kV Gas Insulated Switchgear, and Ancillary Equipments, For TNB Distributions, Johor Mainhead D: SSU Jusco Indahpura Tenaga Nasional Berhad MYR 140,000.00 2015
26 Relocation of 33Kv Cables Near the KLJ LRT Train Depot, Subang Jaya Colas Rail Asia MYR 438,000.00 2015
27 Installation, Testing & Commissioning of 33kv Aluminium XLPE Single Core Underground Cables & Accessories at PMU SDCA, for TNB Distribution Division Tenaga Nasional Berhad MYR 5,951,650.00 2015
28 Relay Retrofitting Works At Existing 132kV PMU Pengkalan & PMU Sri Iskandar, Perak Tenaga Nasional Berhad MYR 690,000.00 2016
29 Kerja- kerja Conversion From 132/22kV 2X30MVA to 132/33kV 2X45MVA at PMU Slim River Tenaga Nasional Berhad MYR 10,730,591.00 2016
30 Installation, Testing and Commissioning of 33kV Aluminium XLPE Core Underground Cables and Accessories at PPU Taman Melati for TNB Distribution Kuala Lumpur. Tenaga Nasional Berhad MYR 4,191,000.00 2016
31 Kerja- kerja Pengalihan Utiliti Bagi Projek Rancangan Tebatan Banjir Sungai Bunus Kuala Lumpur – Membina dan Menyiapkan Kerja- kerja Kabel 132kV Tenaga Nasional Berhad di Lencongan Banjir Sungai Bunus Serta Kerja-kerja Berkaitan. Jabatan Pengairan dan Saliran (JPS) MYR 14,398,000.00 2016
32 Kerja- kerja "Replacement of Primary Equipment and Retrofitting Works for PMU Kulai, PMU Yong Peng North, PMU Melaka & PMU Kelemak". Tenaga Nasional Berhad MYR 9,900,000.00 2016
33 Installation, Testing & Commissioning of 33kV Gas Insulated Switchgear, and other Ancillary Equipment, For TNB Distributions, Johor Mainhead E: SSU Rapid Tenaga Nasional Berhad MYR 140,000.00 2016
34 Installation & Commissioning of 33kV Gas Insulated Switchgear,11kV Air Insulated Switchgear and Ancillary Equipments For PPU Bukit Payong for TNB Distributions, Terengganu Tenaga Nasional Berhad MYR 312,800.00 2016
35 Conversion From 2X60MVA 132/22KV To 2X90MVA 132/33KV at PMU Tasek Cement Gis, Perak Tenaga Nasional Berhad MYR 9,100,000.00 2017
36 Replacement of Primary Equipment and Retrofitting Works for the Substation in State of Kelantan (PMU Tanah Merah, PMU Kota Bharu, PMU Lemal & PMU Rantau Panjang) and Pahang (PMU Tg Gelang & PMU Songsang) Tenaga Nasional Berhad MYR 8,170,000.00 2017
37 Retrofitting and Associated Works for PMU 132kV Batu Kawan South Tenaga Nasional Berhad MYR 757,000.00 2017
38 Installation, Testing and Commissioning of 33kV Aluminium XLPE Single Core Underground Cables, Underground Fiber Optic Cables and Accessories from PMU Puchong Jaya to PPU Kinrara Perdana, for TNB Distribution Selangor Tenaga Nasional Berhad MYR 2,298,050.00 2017
39 Protection Relay Replacement (Supply, Install and Commissioning) of Selected 500kV, 275kV & 132kV Bays for Asset Maintenance Department, Transmission Division (Phase 1A) for Mainhead A: Kelantan, Perak, Pahang & Terengganu Tenaga Nasional Berhad MYR 1,790,000.00 2017
40 Proposed 500kV Overhead Line Termination Works for ATWR-BNTS L1 at PMU 500kV Ayer Tawar Tenaga Nasional Berhad MYR 13,897,000.00 2018

Mechanical

No Description Client Value Year Completed
1 Cadangan Merekabentuk, Membina, Menyiapkan, Mengujiterima, Mentauliah dan Menyenggara Hospital Rehabilitasi Cheras (166 Katil) – Pakej II – Supply, Delivery, Installation, Completion, Testing and Commissioning of the Air Conditioning and Mechanical Ventilation Services for Main Hospital, Wards, Meditel and Plant Room Blocks. Konsortium Gadang Perembun MYR12,800,000.00 2012
2 Cadangan Pembinaan bangunan Pra klinikal Fakulti Perubatan HUKM yang Mengandungi; (1) 1 Blok Bangunan Pentadbiran dan Makmal (II) 1 Blok Bangunan M & E di atas sebahagian lot 45212, Jalan Yaakob Latif, Bandar Tun Razak, Mukim Cheras, Wilayah Persekutuan Kuala Lumpur untuk Universiti kebangsaan Malaysia (Fasa 2) Tim Sekata Sdn Bhd MYR6,774,000.00 2014
3 Projek Menyiapkan Kerja Terbengkalai Hospital Shah Alam (300 Katil) Selangor Pakej 2 (Reka & Bina) Kartamo Corporation Sdn Bhd MYR21,400,000.00 2015
Share this: